MEVA's in-house engineering team supports contractors from pre-tender through to strip-out — providing system selection, panel layout optimisation, structural calculations, and on-site crew training.
From initial concept through to post-pour review — MEVA engineers engage at every critical decision point.
We review your structural drawings and recommend the optimal MEVA system combination — reducing component count, minimising crane picks, and aligning with your programme.
MEVA's certified structural engineers provide full load calculations — concrete pressure, tie-rod forces, propping loads — stamped to local code requirements on request.
MEVA deploys field engineers at first erection — demonstrating correct panel assembly, tie-rod torquing, alignment procedure, and safe stripping sequence.
When a pour is at risk, there is no substitute for an immediate answer. MEVA's technical hotline connects site managers directly with a forming engineer — any time, any time zone.
MEVA publishes certified BIM objects for all major system components. Our engineering portal provides parametric layouts for integration into Revit, ArchiCAD, and Tekla workflows.
After strip-out, MEVA engineers conduct a surface quality assessment — documenting finish class achieved, identifying any honeycombing causes, and optimising the mix or pour sequence for subsequent lifts.
| Max. fresh concrete pressure | 80 kN/m² |
| Panel frame material | Electrowelded steel |
| Panel facing | 18mm phenol-resin coated plywood |
| Service life (cycles) | 300+ casting cycles |
| Available panel heights | 0.6 m — 3.9 m |
| Available panel widths | 0.25 m — 2.4 m |
| Certification | EN 13374, CE Marking |
| Surface finish class | Class F2 / F3 (DIN 18217) |
| Column cross-section range | 150 mm — 1,000 mm |
| Max. column height (per lift) | 3.6 m |
| Max. fresh concrete pressure | 60 kN/m² |
| Column shapes | Square, rectangular, circular |
| Frame material | Hot-dip galvanised steel |
| Adjustment mechanism | Continuous, toolless |
| Certification | DIN 4420, CE Marking |
| Panel reuse cycles | 250+ |
Registered contractors can access MEVA's full technical library — including load tables, assembly instructions, CAD drawings, and BIM objects.
Full product specifications, dimensions, and accessories list
Request Access →Certified concrete pressure, tie-rod force, and deflection tables
Request Access →Step-by-step illustrated assembly manuals for all major systems
Request Access →Revit families, IFC 4 files, and 2D DXF block library
Request Access →Submit your drawings — MEVA's engineers will review your project scope and provide a system recommendation within 48 hours, at no cost.
Start Engineering Consultation