Limited-time engineering consultation — get your formwork layout reviewed by a MEVA expert at no cost. Claim Free Review →

About MEVA — 52 Years of Formwork Innovation

Founded in Haiterbach, Germany in 1970, MEVA has grown from a regional forming specialist into a global technology leader — without ever losing sight of the engineers and contractors who depend on our systems every day.

MEVA manufacturing facility and engineering team

Engineering-First. Always.

MEVA was founded on a single conviction: that concrete forming should be a precision engineering discipline, not a compromise between cost and quality. Over five decades, that philosophy has produced patented panel systems, proprietary frame geometries, and a global engineering support network that no other forming supplier can match.

Today, MEVA operates manufacturing plants in Germany and distributes through owned depots and authorised partners across 70 countries. Our R&D team in Haiterbach continues to develop the forming systems that will define concrete construction for the next generation.

ISO 9001:2015 CE Marking EN 13374 Certified DIN 4420 Approved

Five Decades of Milestones

1970

MEVA Founded

Established in Haiterbach, Baden-Württemberg by formwork engineers committed to advancing concrete technology beyond timber and standard metal decking.

1983

First Panel Patent

MEVA patents the integrated tie-rod waler channel — the innovation that enables the Mammut system's class-leading load capacity without sacrificing panel weight.

1995

International Expansion

MEVA opens its first international depots in France and the United Kingdom, establishing the global rental model that now spans 5 continents.

2003

SKE Climbing System Launch

The SKE self-climbing system launches — enabling 200-metre-plus concrete core construction without continuous crane dependency. Immediately adopted on major European tower projects.

2011

GASS Column System

Launch of the GASS universal column formwork — adjustable from 150 mm to 1,000 mm without special components, transforming column economics for repetitive floor construction.

2018

Digital Engineering Platform

MEVA Engineering Portal goes live — providing contractors direct access to load tables, CAD panel layouts, BIM components, and on-demand technical consultation.

2022

18,000th Project Milestone

MEVA completes its 18,000th registered project — the Lusail Stadium in Qatar — with 6,800 m² of radius-curved formwork for the World Cup venue's grandstand structure.

The MEVA Values

Structural Integrity

Every system we ship is independently load-certified. Safety is not a selling point — it is our baseline.

Engineering Excellence

We invest 6% of annual revenue in R&D — because the best forming system tomorrow has not been built yet.

Global Partnership

Depot stock on 5 continents, engineering support in 12 languages — MEVA is local everywhere that matters.

Long-Term Thinking

300-cycle panel life. Fully recyclable frames. Rental over waste. We build systems that outlast the project.

Numbers That Speak for Themselves

52
Years in Business
70+
Countries Served
18,000+
Projects Delivered
2.1M m²
Rental Inventory
MEVA engineering and technical support team

Work With a Formwork Partner Who Delivers

Whether you're planning your next infrastructure tender or need urgent rental stock for a live site — MEVA's engineering team is ready to support you.